New project - Alexandria, Le Morcellement

Don't miss out on these offers !

The Morcellement consists of some 60 lots of approximately 94-180 toises each, situated at 100 meters from the public beach of Pointe aux Biches.

FEATURED LISTING

Pointe aux Biches, North

427m² residential land with sea & mountain views

Situated at 100 meters from the public beach of Pointe aux Biches. The project is a "Gated" morcellement with all the infrastructure of a high standard: security post at entrance/exit, pavements, underground cabling, green space and landscaping, street lighting of common areas etc. The project is ideal for families wishing to stay in an area close to the beach or to optimize their investment by renting their proposed villa.

ABOUT THE PROJECT…

A "Gated" morcellement

The land is rectangular in shape and measures 10.4 Arpents, in height from the level of the main road. This positioning guarantees sea views, considering that the land between the property and the beach is geometrically pitched and currently intended for agriculture. The area of the lots will be around 94-180 toises for each lot, which is a precise average of the current demand.

HIGH-STANDARD AMENITIES

Enjoy 24-hour security

Benefit from 24-hour security, with a security post and equipped with a double entry and exit bar at the entrance, near the parking area. The parcelling will be "gated" with a private road which will separate the different lots. Following numerous analyses carried out with the promoters, the latter decided to invest a portion of the capital in a particular upgrade of the infrastructures which will give the entire project a subsequent prestige: Wrought iron gate at the entrance, tarring of the path main and interior paths with lighted landscaping, sidewalks and green areas included.

GREEN AREAS

Vast green areas with lawn, flowers and trees

The project has made provision for vast green areas with lawns and flowers and trees planted for shading and for soil retention. Common passageways will consist of permeable paving to prevent flooding. There will also be a network of drain to evacuate rain water towards an underground tank and excess to the private Morcellement drainage system.